Moncks Corner, SC
Data Center

Strategically located in Moncks Corner, South Carolina, our Tier III+ data center offers high-performance infrastructure, 500MW of scalable power, and industry-leading security.

500 MW

MW in Development

500 Acres

Atmosphere Pipeline

1.08 PUE

Sustainably powered, ultra-efficient facility

A Data Center built for the future

Highest point in Berkeley County, pad ready site, 500 acres, energy park with BESS. Near hyperscale campuses. Free cooling from the river. Carbon-free Hydroelectric power.

Sustainability First

Up to 99.9% emissions reduction with our emissions capture system and up to 50% lower energy with our cutting edge cooling.

AI & Cloud Ready

Supports high-density AI/ML workloads with liquid cooling and ultra-low PUE.

Strategic Site Selection

Scalable output capacity, direct connectivity to the world's top data center hubs.

Speed & Scale

30-40% faster build times with modular construction and pre-engineered systems.

Infrastructure & Capabilities

Our facility will provide a robust power infrastructure with N+1 redundancy and energy-efficient cooling, ensuring 99.999% uptime.

Power Infrastructure

Cooling & Environmental Control

Play Video

Seamless, High-Speed, and Redundant Connectivity

As a carrier-neutral facility, we offer multiple Tier 1 & 2 providers for high-speed connectivity with low-latency access to cloud platforms.

Multiple fiber providers for diverse routes

Direct cloud on-ramps to AWS, Azure, Google Cloud and Oracle Cloud

Redundant network paths to eliminate downtime

Site Specifications

Output

500 MW

Size of Land

500 acres

PUE

1.08

Network

Mutliple fiber routes, with the key fiber run from the Myrtle Beach cable landing station to Atlanta