Strategically located in Moncks Corner, South Carolina, our Tier III+ data center offers high-performance infrastructure, 500MW of scalable power, and industry-leading security.
500 MW
MW in Development
500 Acres
Atmosphere Pipeline
1.08 PUE
Sustainably powered, ultra-efficient facility
A Data Center built for the future
Highest point in Berkeley County, pad ready site, 500 acres, energy park with BESS. Near hyperscale campuses. Free cooling from the river. Carbon-free Hydroelectric power.
Sustainability First
Up to 99.9% emissions reduction with our emissions capture system and up to 50% lower energy with our cutting edge cooling.
AI & Cloud Ready
Supports high-density AI/ML workloads with liquid cooling and
ultra-low PUE.
Strategic Site Selection
Scalable output capacity, direct connectivity to the world's top data center hubs.
Speed & Scale
30-40% faster build times with modular construction and
pre-engineered systems.
Infrastructure & Capabilities
Our facility will provide a robust power infrastructure with N+1 redundancy and energy-efficient cooling, ensuring 99.999% uptime.
Power Infrastructure
Up to 1,000MW (1GW) scalable campuses
Dual-feed electrical system
On-site backup generators with extended fuel reserves
Multi-layered UPS system for uninterrupted performance
Cooling & Environmental Control
Air-cooled system with N+1 redundancy
Hot & cold aisle containment for efficiency
Air and Liquid-cooling available as well as direct-to-chip and immersion cooling
Play Video
Seamless, High-Speed, and Redundant Connectivity
As a carrier-neutral facility, we offer multiple Tier 1 & 2 providers for high-speed connectivity with low-latency access to cloud platforms.
Multiple fiber providers for diverse routes
Direct cloud on-ramps to AWS, Azure, Google Cloud and Oracle Cloud
Redundant network paths to eliminate downtime
Site Specifications
Output
500 MW
Size of Land
500 acres
PUE
1.08
Network
Mutliple fiber routes, with the key fiber run from the Myrtle Beach cable landing station to Atlanta